Crane Transport Guide: How to Ship a Mobile or Tower Crane

Cranes are among the most complex pieces of heavy equipment to transport by road. Most mobile cranes and all tower cranes exceed federal legal limits for width, height, and weight, requiring disassembly into multiple loads, multi-state permits, and often law enforcement escorts. Whether you're relocating a 50-ton hydraulic truck crane or moving a lattice boom crawler crane between job sites, understanding the logistics before you call a carrier will save you time and money.

Why Crane Transport Is Different

Unlike a bulldozer or excavator that ships as a single unit, most cranes must be broken down into components for road transport. A typical 100-ton hydraulic truck crane, for example, is disassembled into the carrier/chassis, boom sections, counterweights, and rigging—often requiring 3 to 6 separate truck loads. Each component must be weighed, measured, and permitted individually. The logistics of coordinating multiple loads to arrive at the same destination within a tight window adds significant planning complexity.

Types of Cranes and Their Transport Profiles

Hydraulic Truck Cranes (25–500 ton)

Smaller truck cranes (25–50 ton) can sometimes travel as a single unit if the boom is retracted and the counterweights are removed. The carrier itself typically weighs 60,000 to 120,000 lbs and may be 10 to 14 feet wide. Counterweights are shipped separately on flatbeds. Larger truck cranes (100–500 ton) always require full disassembly into 4 to 8 loads.

Crawler Cranes (50–2,000 ton)

Crawler cranes are the most complex to transport. The carbody, crawlers, boom sections, pendants, and counterweights are all shipped separately. A 300-ton crawler crane may require 10 to 20 truck loads. The carbody alone can weigh 150,000 to 400,000 lbs, requiring multi-axle specialized trailers and engineering surveys for every bridge on the route.

Tower Cranes

Tower crane sections (mast, jib, counter-jib, cab) are typically within legal dimensions and weight limits when disassembled, often shipping on standard flatbeds. The challenge is coordinating delivery sequencing so sections arrive in the correct order for erection.

Trailer Selection for Crane Components

ComponentTypical WeightTrailer Type
Truck crane carrier (25–50 ton)60,000–120,000 lbsSelf-propelled or RGN
Boom sections5,000–40,000 lbs eachFlatbed or Step Deck
Counterweights10,000–80,000 lbs per setFlatbed or Lowboy
Crawler carbody80,000–400,000 lbsMulti-Axle Lowboy or Goldhofer
Crawler tracks20,000–60,000 lbs eachLowboy or RGN

Permit Requirements and Lead Times

Any crane component exceeding federal thresholds—80,000 lbs GVW, 8.5 ft wide, 13.5 ft tall, or 53 ft long—requires state-issued oversize/overweight permits. Because cranes are divisible loads (they can be broken down further), states may deny superload permits if the carrier hasn't demonstrated that the load is at its minimum divisible configuration.

Standard permit processing takes 7 to 10 business days. Superloads (loads significantly exceeding standard oversize thresholds, typically over 200,000 lbs or 16 ft wide) require engineering surveys and can take 3 to 6 weeks for permit approval. Plan accordingly—crane moves that seem straightforward can be delayed significantly by permit processing backlogs in high-traffic states like California, Texas, and New York.

Escort Vehicle Requirements for Crane Loads

Escort requirements vary by state but follow general patterns:

  • Width 10–12 ft: One rear escort in most states
  • Width 12–14 ft: Front and rear escorts required
  • Width over 14 ft: Two escorts plus law enforcement in many states; daylight travel only
  • Superloads: State police escort required in most jurisdictions; travel restricted to specific hours and days

Twelve states require Pilot/Escort Vehicle Operator (P/EVO) certification, including California, Texas, Florida, Colorado, and Georgia. IronHaul coordinates certified escorts for every state on your route.

Pre-Transport Preparation Checklist

  • Obtain exact weights and dimensions for each component (do not rely on manufacturer specs—weigh on certified scales)
  • Mark all lift points and tie-down locations on each component
  • Drain or secure hydraulic systems to prevent leaks during transit
  • Remove or secure all loose rigging, hooks, and accessories
  • Photograph all components from multiple angles before loading
  • Confirm pickup and delivery site access for large transport rigs (turning radius, overhead clearances, ground bearing capacity)

Ready to Move Your Crane?

IronHaul Logistics has experience coordinating multi-load crane moves across the continental US. We handle permit applications for every state on your route, source certified escorts, and sequence multi-truck deliveries to match your erection schedule. Call (208) 495-2260, email [email protected], or submit our online quote form with your crane make, model, and component breakdown for a detailed transport plan.

Common questions

Can a mobile crane be shipped as a single unit?

Small truck cranes (25–50 ton) can sometimes travel as a single unit with the boom retracted and counterweights removed, if the resulting dimensions and weight are within permit thresholds. Most cranes over 50 tons must be disassembled into multiple loads.

How many trucks does it take to move a 100-ton crane?

A 100-ton hydraulic truck crane typically requires 3 to 6 truck loads: the carrier/chassis, boom sections (often 2–3 loads), and counterweights. A 300-ton crawler crane may require 10 to 20 loads.

How far in advance do I need to plan a crane transport?

For standard oversize crane components, plan 2 to 3 weeks ahead to allow for permit processing (7–10 business days) and carrier scheduling. Superloads (over 200,000 lbs or 16 ft wide) may require 4 to 8 weeks for engineering surveys and permit approval.

What is the most expensive part of crane transport?

For large crawler cranes, the carbody and counterweight loads often require multi-axle specialized trailers (Goldhofer or similar) that cost significantly more per day than standard lowboys. Superload permit fees and law enforcement escorts also add substantial cost.

Do crane components need to arrive in a specific order?

Yes, especially for tower cranes and crawler cranes. The erection sequence dictates delivery order—base sections and carbody must arrive before boom sections and counterweights. IronHaul coordinates multi-truck sequencing to match your crane erection plan.