Long-Reach Excavator Transport Guide: How to Ship a Long-Reach Excavator
Long-reach excavators are specialized machines built for extended-reach applications like dredging, canal cleaning, slope maintenance, and deep foundation work. Their elongated boom and arm assemblies make them significantly taller and longer than standard excavators in transport configuration, requiring careful planning for trailer selection, disassembly, and permit procurement.
What Is a Long-Reach Excavator?
A long-reach excavator is a standard excavator base fitted with an extended boom and arm assembly, allowing digging reach of 50–65 feet or more compared to the 20–30 foot reach of a conventional machine. Manufacturers including Caterpillar, Kobelco, Komatsu, Hitachi, and Volvo offer long-reach configurations on mid-size to large excavator platforms.
Typical Dimensions and Weights
| Machine Class | Operating Weight | Transport Length | Transport Width | Transport Height |
|---|---|---|---|---|
| Mid-Size (25–30 ton) | 55,000–66,000 lbs | 45–52 ft | 10–11 ft | 10–11 ft |
| Large (35–45 ton) | 77,000–100,000 lbs | 50–60 ft | 11–12 ft | 10–12 ft |
| Heavy (50+ ton) | 110,000–130,000 lbs | 55–65 ft | 11–13 ft | 11–13 ft |
Note: Transport dimensions vary significantly by model and boom configuration. Always verify specs with the manufacturer or equipment manual before booking transport.
Disassembly Requirements
Long-reach excavators almost always require partial disassembly for transport. The extended boom and arm assembly typically cannot be transported in one piece without exceeding legal height or length limits. Common disassembly steps include:
- Boom removal: The main boom is often pinned and can be removed and transported separately on a flatbed or step-deck
- Arm removal: The long arm/stick is removed and transported as a separate piece
- Counterweight removal: Heavy counterweights are often removed to reduce axle weights and transported separately
- Bucket/attachment removal: Grapples, buckets, and other attachments are always removed for transport
Disassembly and reassembly typically require a qualified mechanic and can add $500–$2,000 to the total transport cost. Plan for 4–8 hours of labor at each end of the move.
Trailer Selection
The excavator base (without boom) typically rides on a lowboy or RGN trailer. The boom and arm sections are transported on separate flatbed or step-deck trailers. Key considerations:
- RGN (Removable Gooseneck): Best for the excavator base; allows drive-on loading and provides the lowest deck height (~18–20 inches) for height-sensitive loads
- Lowboy / Double Drop: Alternative to RGN for the base; deck height of 18–24 inches
- Flatbed or Step-Deck: Used for boom and arm sections; these are long but relatively light and can often be transported within legal dimensions
Permit Requirements
Long-reach excavator transports almost always require oversize/overweight permits. Federal thresholds that trigger permit requirements:
- Gross Vehicle Weight (GVW) over 80,000 lbs
- Width over 8.5 ft (102 inches)
- Height over 13.5 ft
- Length over 53 ft (varies by state)
Most long-reach excavator moves will exceed at least two of these thresholds. Expect permits in every state traversed, with costs ranging from $50–$300 per state for standard oversize loads. Loads over 14 ft wide require pilot cars; loads over 16 ft wide may require police escort in some states.
Loading and Unloading Considerations
Loading a long-reach excavator requires a level, firm surface with adequate clearance for the boom sections. Key considerations:
- Ensure the loading area can support the combined weight of the machine and trailer during loading
- Boom sections require careful blocking and securing to prevent movement during transit
- Hydraulic lines must be capped and secured to prevent leaks during transport
- Track shoes should be inspected for sharp edges that could damage trailer decking
Cost Factors for Long-Reach Excavator Transport
Long-reach excavator moves are more complex and expensive than standard excavator transport due to disassembly requirements and multiple trailer loads. Typical cost factors:
- Base transport rate: $3.00–$6.00 per mile for the excavator base on an RGN or lowboy
- Separate trailer for boom/arm sections: $2.00–$4.00 per mile
- Disassembly/reassembly labor: $500–$2,000 per end
- Permits: $200–$800 total depending on states and load dimensions
- Pilot cars: $150–$400/day per escort vehicle
Get a Quote from IronHaul Logistics
IronHaul Logistics specializes in complex heavy equipment moves including long-reach excavators. We coordinate multi-trailer moves, disassembly logistics, and multi-state permit procurement so you don't have to. Call us at (208) 495-2260, email [email protected], or fill out our online quote form to get started.
Common questions
Does a long-reach excavator need to be disassembled for transport?
Almost always yes. The extended boom and arm assembly typically exceeds legal length or height limits when attached to the base. The boom and arm are removed and transported on separate trailers, while the excavator base rides on a lowboy or RGN.
What trailer is used to ship a long-reach excavator?
The excavator base typically rides on an RGN (Removable Gooseneck) or lowboy trailer. The boom and arm sections are transported on separate flatbed or step-deck trailers. Most long-reach moves require 2–3 trailers total.
How much does it cost to ship a long-reach excavator?
Long-reach excavator transport is more expensive than standard excavator moves due to disassembly and multiple trailers. Total costs typically range from $3,000 to $15,000+ depending on distance, machine size, and number of states crossed. Contact IronHaul for an exact quote.
How long does it take to disassemble a long-reach excavator for transport?
Disassembly typically takes 4–8 hours with a qualified mechanic. Reassembly at the destination takes a similar amount of time. Plan for this labor cost and time in your project schedule.
Do long-reach excavator transports require pilot cars?
Usually yes. Most long-reach excavator moves exceed 12 ft in width or 13.5 ft in height, triggering pilot car requirements. Loads over 14 ft wide require two pilot cars in most states.